Herunterladen Diese Seite drucken

dirna Bergstrom bycool green line Montageanleitung Seite 16

Split off road

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

SPLIT
EN
EVAPORATOR
1
Position the evaporator in the most ideal part of
the cabin in vertical position.
2
Take down the cover and coil and mark the
evaporator support points. The unit can be
secured to the tray directly with screws or using
the supplied support pieces.
3
Bore Ø8.5 holes for throughbore or Ø11 to
position M8 rivet nuts.
4
Bore Ø35 holes in the right side of the tray in
order to pass piping through this side, and then
position the bushing.
1
16
Air conditioning for vehicles
4

Werbung

loading