Herunterladen Diese Seite drucken

Cola DOMUSFIRE C17 HR Installations-, Bedienungs- Und Wartungsanleitung Seite 64

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

6
MAINTENANCE
6.1 Introduction
Operations on the internal parts of the boiler must be carried out by qualified personnel. Contact the nearest
authorised service centre.
Make sure the boiler is unplugged and cold before carrying out any work on it.
6.2 Removing the boiler cladding
Key:
1- Pellet hopper door
2- Central middle covers
3- Side panel
4- Front cover
5- Insulated outer door
6- Rear panel
6.3 Boiler internal parts
Key:
1- Knob with threaded rod
2- Turbulator-shaker device extension pin
3- Bush locking nut
4- Pin sliding bush
5- Outer cover
6- Upper thermal protection
7- Middle protection
8- Vermiculite upper protection
9- Vermiculite side protection
10-Chamber outer thermal protection
11-Protection support cover
12-Turbulator support
13-Turbulators
14-Fire door
15-Safety valve
16-Ash door
17-Ash box
18-Heating chamber
64
DOMUSFIRE C17-C24 HR

Werbung

loading

Diese Anleitung auch für:

Domusfire c24 hr