Herunterladen Diese Seite drucken

Bamo NivOil Bedienungsanleitung Seite 22

Öl-/leichtflüssigkeitsabscheider-überwachung
Vorschau ausblenden Andere Handbücher für NivOil:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MOUNTING
- Always mount the sensor supply unit (NivOil CU) outside the hazardous areas ("safe area").
Mount probes:
The routing of the connecting lines of the probes through the separation between the areas with category 1G requirements
and less hazard areas must be carried out in such a way that the degree of protection IP67 in accordance with EN 60529 is
ensured.
Oil probe (NivOil OP):
Install the sensor in such a way that the tip of the probe is positioned at the height of the desired alarm point.
The probe tube has three circumferential markings at a distance of 5cm, 10cm and 15cm from the probe tip (= switching point).
They are used to easily set the desired alarm point.
High level probe (NivOil HP):
Mount in the inlet chamber, the lateral hole must be at the height of the desired max. permissible accumulation level.
High level probe (NivOil HPS):
Mount the probe so that the lower edge of the ultrasonic fork is at the height of the desired max. permissible inflation level.
Sludge level probe (NivOil SP):
Mount the probe so that the lower edge of the ultrasound fork is approx. 2cm lower than the desired alarm point.
NON-EX ZONE
NivOil CU
Power
EN
M-531.01-EN-AK du 30-06-2023 - Manufacturer : BAMO IER - Pirnaer Straße 24, D-68309 Mannheim - Germany (Translated document)
EX ZONE
SP
·
OP
HP / HPS
DP0041

Werbung

loading