Herunterladen Diese Seite drucken

Oase BioCompact 25 Bedienungsanleitung Seite 16

Vorschau ausblenden Andere Handbücher für BioCompact 25:

Werbung

Commissioning/start-up
• Switching on: Plug the power plug into the outlet.
– The unit switches on immediately.
– Lay the mains cable so that a drip loop is formed and the lowest point is below the socket. This
prevents dripping water from entering the socket.
– Set the desired flow rate.
• Switching off: Pull the power plug from the outlet.
Form a drip loop
16
Set the flow rate
BSE0003
BCT0014

Werbung

loading

Diese Anleitung auch für:

Biocompact 50