Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Rigging - EuroLite LED TMH-80 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

Rigging

The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
22/32
(17) Fuseholder
(18) Power supply
(19) DMX input
(20) DMX output
00083263.DOC, Version 1.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis