28 | WBE 4100 | Commissioning
4.

Commissioning

4.1

Unpacking

1. Remove the steel bands and fasteners.
2. Carefully lift off the packaging.
3. Remove the wheel guard, accessories and packaging
material from the packaging unit.
i
Check that the WBE 4100 and the accessories are in
proper working order and that there are no visible
signs of component damage. In case of doubt, do
not start up the unit and consult customer service.
i
Remove the accessories and packaging material from
the packaging unit.
4.2

Setting up

1. Unscrew the screws that secure the WBE 4100 to
the pallet.
WARNING – Defective or incorrectly at-
tached lifting straps!
Risk of injury due to WBE 4100 falling down.
Check lifting straps for physical damage
before attaching.
Tighten lifting straps uniformly.
Lift WBE 4100 carefully.
2. Attach slings of the same length and sufficient load bea-
ring capacity (min. 100 kg) as shown in the drawing.
|
1 695 656 133
2011-02-18
3. Hoist the WBE 4100 with a crane. Erect in the inten-
ded area, taking care to comply with the specified
minimum distances.
i
To ensure reliable, ergonomic use of the WBE 4100,
we advise setting it up at a distance of 500 mm from
the nearest wall.
4. Secure the WBE 4100 to at least 3 points on the
floor.