Herunterladen Inhalt Inhalt Diese Seite drucken

How To Install The Appliance In The Installation Opening; Proper Levelling - Wolkenstein WGSP14-6DFI Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

H
OW TO INSTALL THE APPLIANCE IN THE INSTALLATION OPENING
1. Prepare an installation opening according to the figure below.
Depending on where your safety socket is located, you may need to cut a hole in
one side of the cabinet.
1
2
3
4
5
6
C
2. Install the appliance in the installation opening.
WARNING! The power cable and the hoses must not be kinked or
bent when installing the appliance in the installation opening.
3. The free space between the top of the appliance and the worktop must be less
than 5 mm; see also chapter 2.10 P
4. The door of the appliance must be aligned with the adjacent cupboard doors.

2.10 Proper levelling

 The appliance must stand in a stable and level position to ensure proper
operation. The supporting feet must stand firmly on the ground so that the
appliance does not wobble. Adjust the supporting feet accordingly. The firm
D
ISTANCE BETWEEN CABINET BOTTOM AND FLOOR
ONNECTIONS FOR POWER CORD
820 mm
580 mm
600 mm
80 mm
,
WATER INLET
ROPER LEVELLING
~
~
102
= 100 mm
,
WATER OUTLET
.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis