Herunterladen Diese Seite drucken

Respekta CH 11050 IS Bedienungs- & Installationsanleitung Seite 36

Vorschau ausblenden Andere Handbücher für CH 11050 IS:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

To install the extractor hood on a concrete ceiling, proceed as follows:
1. Use the enclosed drilling template and mark the 4 drill
holes for the mounting plate (B) with a pencil on the ceiling
B
2. Drill the 4 required holes (6mm / 60mm deep) in the
ceiling.
3. Place one dowel in each of the 4 drill holes.
4. Attach the screw cylinder to the mounting plate (B) and attach the screw cylinder to the
suspension plate from above and below using 2 M10 nuts (Fig. B2). Make sure that the screw
cylinder is not higher than the top of the mounting plate to insure the installed level of the plate.
Fig. B2
5. Follow steps
1
and
2
(Fig.B3) to insert the end of the 4 wire ropes into the slots on the top plate
of the extractor hood, and use 4 pcs ST4 * 8mm countersunk screws to lock the wire ropes, to
avoid slide out.
Fig. B3
dop
 14
fi220301ATL

Werbung

loading

Diese Anleitung auch für:

Ch 11050 iw