Herunterladen Diese Seite drucken

Dwt-Zelte Auvents Anleitung Seite 16

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Awnings
Repeat the previous three steps
with the opposite end of the awning.
Now push the small canopy supports
in place, taking care at this point that
the side- and centre-brackets are
clearly seen through the pole cut-out
and that the brackets are not over-
tensioned forwards.
Note:
• If canopy tensioner poles are also
supplied, they are fitted at this
point. In the canopy, these poles
connect the side supports with
those in the centre.
• Before taking the next steps,
arrange the roof of the awning
so that all horizontal seams in the
front and side walls are running
horizontally.
Set the side walls in place.
Set the front wall in place.
061443-15_Aufbau_Vorzelt_GB.indd 4
www.dwt-zelte.com
27.10.11 11:07

Werbung

loading