Herunterladen Diese Seite drucken

Dwt-Zelte Auvents Anleitung Seite 14

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Awnings
Off we go!
Please read the instructions through
carefully before you start putting up
the awning.
Lay out protective sheeting or tent
carpet in front of the caravan.
Fit the frame together, fit the screws
or clamps.
Lay out the corners poles, roof poles
and ridge poles on the ground in
front of the caravan according to the
pole diagram. Do not connect these
individual parts yet. You can put addi-
tional poles such as extra roof poles,
verandah poles or canopy tensioners
to one side for the moment.
These will be needed later.
Clean the caravan's awning rail,
making sure there are no sharp edges,
and feed the roof of the awning in.
For caravans with a sloping front,
please use the double wind flap on
the right side wall which is stitched
on. With the help of the wind flap you
can still tighten the sidewall vertically,
and attach an annex, according to
level of equipment.
Caution
(Refers to all steps of setting up)
• Please always tighten the fastening screws or fastening devices so that the individual poles cannot close up
again or come away from one another. You will avoid any chance of injury and will stop the caravan being
damaged by falling poles.
Important
To avoid any damage occurring to your caravan
• the screws or other fastening devices for the roof poles should be so adjusted that if they do come loose
and fall, the side wall of the caravan is not going to be damaged.
• connect the roof poles with the brackets by making sure they engage properly over both poles pushed in,
and only then, telescope them. In this way you will avoid pulling the front pole out and the rest of the pole
falling back and hitting the caravan.
061443-15_Aufbau_Vorzelt_GB.indd 2
www.dwt-zelte.com
27.10.11 11:07

Werbung

loading