Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
DE
EN
FR
ES
IT

6. Assembly

Assembly is only necessary if the Donkey is delivered in the shipping box.
Step 1:
Carefully remove the handles (1+2) from under the
electric pushcart. These are tied upwards to take the
strain off the cables
1
2
Step 2:
Lift the tub from the electric pushcart. Under the
trough are the cross connectors of the steering bar (3).
Inside the tub are the charger (4) and assembly tool
(5) for assembling the parts.
3
Step 3:
Place the tub (6) on the electric wheelbarrow with the
angled side facing forwards.
Step 4:
4
Secure the tub to the electric pushcart with the screws
(7).
5
Step 5:
Fasten the steering bars (8+9) on the left and right
6
with 4 screws each. However, do not tighten the
screws yet.
Make sure that they are correctly seated and that the
cables are not damaged.
7
7
7
7
8
9
16

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Donkey xl-h

Inhaltsverzeichnis