Herunterladen Inhalt Inhalt Diese Seite drucken

LG RESU10H Prime Installationsanleitung Seite 13

Vorschau ausblenden Andere Handbücher für RESU10H Prime:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Handle
Front Cover
M5 PH Bolt 6ea
Front Protection Cover
13
17.
onto the wall.
* Tighten the M6 Flange Bolts with a
torque of 5N·m(3.7lbf·ft).
18. Re-attach the top cover.
* Tighten the M5xL65 Flange
Bolt (4ea) with a torque of
5N·m(3.7lbf·ft).
19. Open the front cover.
* Hold the handle and turn it
counterclockwise.
20. Loosen 6 bolts and remove the Front
Protection Cover.
* Be careful not to drop the bolts into
the pack at this stage.
21. Assemble the adapter or cap
according to regional regulations.
Insert the RMD ethernet cable
through Hole #2 and connect the
cable. Then proceed to Section 3.2
Installation for Remote Monitoring
Hole #2
Hole #1
22. Assemble the adapter or cap
according to regional regulations.
Then insert the power and
communication cables through the
holes from outside of the pack.
* Arrange the internal cable as
required to avoid blocking the holes
for external cables.
* Assemble custom gland (AU only)
according to regional requirement.
Internal cable
With custom gland, remove blank
cables, do not leave open hole
Hole #2 Communication cable
Hole #1 Power cable
23. Connect the cables according to their
application.
* Refer to Section 3.3 Cable
Connections.
24. Arrange the power cables and
communication cables separately
using cable ties.
* Leave no gap between the cables
and the conduit knock out to
prevent foreign materials from
entering the battery pack.
* Apply silicone sealant or putty
around the cables at each outer
cable connection hole to prevent
foreign materials from entering the
battery pack
* For Australia only, silicone sealant
or putty is not required.
Instead, required art is Cobalt Solar
Custom Gland, part number CSE-
CHG-3/4NPT-H3-5.5-1B (pack
of 2). Available from your RESU
distributor.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis