-Ensure that the refrigeration system is earthed prior to charging the system
with refrigerant.
-Label the system when charging is complete (if not already).
-Extreme care shall be taken not to overfill the refrigeration system.
Prior to recharging the system it shall be pressure tested with OFN. The
system shall be leak tested on completion of charging but prior commissioning.
A follow up leak test shall be carried out prior to leaving the site.
16.Decommissioning
Before carrying out this procedure, it is essential that technician is completely
familiar with the equipment and all its detail. It is recommended good practice
that all refrigerants are recovered safely. Prior to the task being carried out, an
oil and refrigerant sample shall be taken in case analysis is required prior to
reuse of reclaimed refrigerant. It is essential that electrical power is available
before the task is commenced.
Become familiar with the equipment and its operation.
b)Isolate system electrically.
c)Before
attempting
the
procedure
ensure
that:mechanical
handling
equipment is available, if repaired, for handling refrigerant cylinders;all
personal protective equipment is available and being used correctly; the
recovery process is supervised at all times by a competent person; recovery
equipment and cylinders conform to the appropriate standards.
d)Pump down refrigerant system, if possible.
e) if a vacuum is not possible, make a manifold so that refrigerant can be
removed from various parts of the system.
f) Make sure that cylinder is situated on the scales before recovery takes
place.
g)Start the recovery machine and operate in accordance with manufacturer's
instructions.
h)Do not overfill cylinders(No more than 80% volume liquid charge).
i)Do not exceed the maximum working pressure of the cylinder,even
temporarily.
j)When
the
cylinders
have
been
filled
correctly
and
the
process
completed,make sure that the cylinders and the equipment are removed from
site promptly and all isolation valves on the equipment are closed off.