Herunterladen Inhalt Inhalt Diese Seite drucken

Sygonix WLAN Zigbee 4 Bedienungsanleitung Seite 33

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

*) Technical knowledge required to perform the in-
stallation:
For the installation, the following specialist knowledge is
required in particular:
The "Five safety rules": Disconnect from the mains;

protect against accidental switch-on; ensure there is
no voltage; earth and short-circuit; cover or protect
neighbouring live parts.
Use suitable tools, measuring devices and personal

protective equipment, where necessary.
Analyse measurement results.

Use electrical installation materials to ensure the

turn-off criteria.
IP protection ratings

Install electrical installation materials

Type of power supply (TN system, IT system, TT sys-

tem) and the corresponding connection criteria (clas-
sic earthing, protective earthing, necessary additional
measures etc.)
If you are not a professional, do not do it yourself,
have it performed by a specialist.
33

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

2525292

Inhaltsverzeichnis