Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Functional Check; Maintenance; Faults - ATW SIMCO-ION HE Bedienungsanleitung

Ionensprühdüse
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6 Commissioning

Starting
- Provide compressed air to the nozzles.
- Switch on the power supply.

7 Functional Check

The indicator light on the power supply unit shows whether high-voltage is present.
With a Simco-ION voltage detector, it can be checked the whether there is high-voltage present
on the emitter points of the nozzle(s).
A field probe could be used to determine the efficiency of the nozzles. Please do measure the
static discharge on the material to be discharged both before and after blowing it out with the
nozzle(s). The measured charge should disappear after being blown clean.

8 Maintenance

Warning:
-
Disconnect the power supply before carrying out work on the unit.
- Clean the ionization points of the nozzles regularly with a non-metal brush.
- In the case of strong contamination, isopropyl alcohol can be used to clean the ionization
points.
NOTE: Avoid excessive use of liquid detergents. Allow the nozzles to dry thoroughly before
they are reused.

9 Faults

Warnings:
- Disconnect the power supply before carrying out work on the unit.
- Electrical installation and repairs must be carried out by a skilled electrical engineer
according to the applicable national and local regulations.
Tabel 1, faults
Problem
No/poor ionisatiion
No high voltage on the
Ionization points
HE_UM_9752041010_NL_D_GB_F_V4_1
Reason
No voltage
Ionisation points
contaminated
Ionisation points damaged
High Voltage defect
Short circuit in the HS
cable or nozzle
Solution
Switch on supply voltage
Clean ionisation points
Change nozzles
Restore high voltage power
supply
Fix short circuit or replace
nozzle
GB
32

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis