Herunterladen Inhalt Inhalt Diese Seite drucken

AVENLI RP2-21-CZ Benutzerhandbuch Seite 12

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 71
Step 6. ASSEMBLY OF THE WATER SUPPLY AND TUBES
Insert and secure the T-joints into the holes. Ensure that they are fully connected.
PART 5 - Filling the pool
WARNING: Do not leave the pool unattended during filling.
WARNING: If more than 2.5 - 5 cm of water collects on either side before filling the
middle section. The pool is not placed on a level place! Remove the drain plug, drain all
water, completely disassemble the pool, move the pool to a flat surface and reassemble.
WARNING: Do not fill the pool with excessive water as it may collapse. During periods of
heavy rain, it is likely that some water will be drawn off to maintain the correct water
level in the pool.
1. Check that the drain hole is properly plugged and that the cap is on. Start filling the
pool with water. When there is approximately 2.5 cm of water in the bottom, stop
filling and smooth out the bends in the bottom of the pool. Around the perimeter of
the pool, pull the outer wall up past the top edge so that the pool fills evenly.
2. Continue filling the pool to the desired level.
Locate the holes on one side of the horizontal support.
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis