Herunterladen Inhalt Inhalt Diese Seite drucken

Abt AEC Montageanleitung Seite 25

Für 2,0 btd t6.1 eu6 ap
Vorschau ausblenden Andere Handbücher für AEC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mountinginstruction AEC for 2,0 BTD T6.1 EU6 AP
D Disconnect the air mass meter
and connect it to the ABT (air
mass meter) connector. Position
the wiring harness in such a way
that it is protected from abrasion
and away from heat.
Attach the ground wire (GND) to
the ground point of the battery.
Connect continuous positive
(+12V) to the battery terminal as
well.
Note: The continuous positive
cable is equipped with a flying
fuse.
Note:
Lay the sensor wiring harness
in the engine compartment in
such a way that it does not
catch or rub.
page 10/15
© 2021 ABT Sportsline GmbH

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis