Herunterladen Inhalt Inhalt Diese Seite drucken

Vortice Air Door AD900 Betriebsanleitung Seite 15

Vorschau ausblenden Andere Handbücher für Air Door AD900:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 25
ENGLISH
A Mounting on concrete walls
Fix the bolts in the right position (establish this
position using the mounting plate and pour the
cement into the bolt holes) (fig.11).
11
11
Concrete
13-15
mm
When the cement has hardened, position the
mounting plate using the washer and nut as indicated
in the fig.12.
12
12
Washer
Elastic
washer
Nut
Fixing
plate
Apply the central body to the uppermost part of the
mounting plate and hook it on as indicated in the
fig.13.
13
13
70 mm
B Mounting on wooden walls
Fix the mounting plate in the right position using
threaded screws (fig.14)
14
14
Wood screw
Fixing plate
Apply the central body as described before (fig.15).
15
15
C Mounting above the ceiling (false ceiling)
Fix the air curtain in place using the same installation
procedure as for concrete walls.
Connect the pipes as shown in the fig.16.
16
16
Air duct
Ceiling
NOTE:
if mounting above the ceiling, appliance
performance could vary with respect to the stated
values.
In
Out
15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis