Commissioning
6.1
Commissioning the product
All manuals and user guides at all-guides.com
Commissioning
A
A
C
Maximum 1
B
1. Apply pressure to the sys-
2. Fill and flush the heating
3. Open the white hand
D
4. Open the return valve of
E
5. Slightly open the flow
1
/
2
6. Close all other valves (A).
7. Fill the heating system
8. Fully open the flow valve
9. Close the flow valve and
10.Repeat the above steps
tem.
system via the pipes or
the boiler filling and drain
valves KFE (E).
wheels (D) for filling and
flushing via the boiler fil-
ling and drain valves KFE
(E).
the first heating circuit (B).
valve of the first heating
circuit (C).
with a maximum of 5 bar
and flush it.
(C) as soon as water flows
into the heating circuit.
the return valve of the fil-
led heating circuit.
for filling and flushing for
all other heating circuits.
MC 1
EN
12