Description
Scope of supply
TA 10:
1 cycling timer PRS 10/D-LUX,
with Instructions
1 connector
1 strainer, G ½, EN 228-1
1 reducer G ¼-G ½, EN 228-1
1 3/2-way solenoid valve, G ¼, G 3/8, EN 228-1,
with Instructions
1x Installation Instructions for the TA 10
Code letters for connections 5
P = pressure connection
A/B = valve outlet to MPA...
R = exhaust or drain outlet
Function
The TA 10 programme-controlled blowdown system consists of an electronic cycling timer 1 with
connector 2, a 3/2-way solenoid valve 5, a strainer 3 and a reducer 4.
The PRS 10 cycling timer generates a control pulse that operates the solenoid valve. The solenoid valve
allows in compressed air or pressurised water, which opens the MPA... intermittent blowdown valve.
Medium
Solenoid valve control medium: Compressed air or pressurised water, 4 – 8 bar depending on the
■
rapid-action blowdown valve and the boiler pressure (see MPA...)
Potentially explosive atmospheres
The TA 10 equipment is not suitable for use in potentially explosive atmospheres.
TA 10 - 809178-00
2
2
TA10_06.eps
3
4
4
3
1
5
A
P
B
R
1
5
11