Herunterladen Inhalt Inhalt Diese Seite drucken

Instructions For The User; Preparation And Start-Up - Iberital L’ANNA Installations- Und Betriebshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 101
IBERITAL

2.- INSTRUCTIONS FOR THE USER

2.1.- DESCRIPTION
1) Coff ee feed control buttons (CPU)
2) One-cup espresso feed
3) Two-cup espresso feed
4) Non-stop coff ee feed
5) One-cup coff ee feed
6) Two-cup coff ee feed
7) Steam tap
8) Hot water dispenser
9) Steam dispenser
10) Pump gauge
11) Boiler pressure gauge
12) Three-position switch
0 = OFF/STOP
1 = ON (Automatic fi lling connected)
2 = Control (Elements connected)
13) Red ON/OFF indicator light
14) Green ELEMENTS indicator light
15) Tray
16) Rating plate

2.2.- PREPARATION AND START-UP

2.2.1. Stationary coff ee machines
a) Open the water stopcock (24).
b) Connect the permanent thermo-magnetic switch (23).
c) Machines with single boilers: Set the machine switch (12) to position 1 and wait until the automatic
d) Machines with two boilers: Set the machine switch (12) to position 1 and wait until the automatic
e) Set switch (12) to position 2 and the heating elements will begin to heat the water in the boiler.
Wait until the working pressure is reached. The green indicator light (14) will go out. The boiler pressure gauge will
indicate the desired working pressure (0.08 MPa - 0.1 MPa). In the case of the Iberital Expression Two machine, the
desired working pressure is (0.1-0.12 MPa).
2.2.2. Portable coff ee machines (Iberital L'Anna Handy)
a) Fill the water deposit with 3 litres of water.
b) Connect the machine to the power supply.
c) Set the switch (12) to position 1. The red indicator light (13) will come on. This is followed by the
d) Set the switch (12) to position 2. The green indicator light (14) will come on.
Wait about 10 minutes until the working pressure is reached, as indicated by the green range on the gauge (10, 11).
The green indicator light (13) will go out.
General warnings: It is recommended that, once the working temperature has been reached, water is made to fl ow
through the groups for a moment in order to induce the thermosyphon current, thus enabling the system to reach the
ideal temperature to begin working.
It is also of the utmost importance that the fi lter holder structures are fi tted to the groups, so that the metal on the
fi lter holders also reaches the necessary temperature to dispense correctly the fi rst coff ees.
When turning on the main switch, it must be put into position 1 before moving on to position 2.
While there is no pressure in the machine boiler or, similarly, if it is not yet hot, do not press the hot water button. If it
were pressed, cold water would be obtained.
Page 46
Downloaded from
www.Manualslib.com
level control completes the fi lling of the steam/hot water boiler with water.
level control completes the fi lling of the steam/hot water boiler with water. The coff ee boiler will fi ll
thanks to the mains pressure (it is recommended that the non-stop coff ee buttons (4) are pressed
until water comes out of the groups).
automatic fi lling of the boiler.
manuals search engine
17) Removable side panels
18) Hot water control knob
19) Hot water dosage
20) Feed button (automatic versions)
21) Filter holder
21a) Filter holder for one coff ee
21b) Filter holder for two coff ees
21c) Filter for one coff ee
21d) Filter for two coff ees
21e) Cleaning fi lter
22) Boiler water level viewer
23) Permanent thermo-magnetic switch
(Not included. Must be installed by a local authorized technician)
24) Mains water stopcock
(Not included. Must be installed by a local authorized technician)
25) Display
26) Drain valve
27) Deposit water inlet (Iberital L'Anna Handy)
INSTALLATION AND OPERATION MANUAL

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis