Herunterladen Inhalt Inhalt Diese Seite drucken

Important Information Before Installing; Installation Procedure - KKT KOLBE CUBE Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für CUBE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
!
9.2 Important information befo-
re installing the appliance:
• Clean the environment thoroughly
before and after installation so that
no dust or construction debris can be
sucked in during initial operation.
• Only install the unit in a suitable
location.
• Check the ceiling for load-bearing
capacity and load-bearing capacity: It
must be able to bear a weight of min.
120kg and be min. 30mm thick.
• Check the routing of electrical and
other cables on and in the wall or cei-
ling so that they are not drilled into.
• Check the condition and load-bearing
capacity of the electrical cables.
The installation of the appliance by a
specialist is recommended.

9.3 Installation procedure

• Position the suspension plate on the
ceiling, mark the position of the drill
holes and drill the holes according to
the required plugs / screws.
Note:
Use dowels and screws according to
the nature of the ceiling on which the
plate is to be installed.
Ask an installer or qualified techni-
cian which anchor bolts or screws to
choose.
36
• Connect the decor panel to the sus-
pension plate using the 2 x ST4 (8mm)
screws.
ST4 x 8
• Slightly press the tips of the rope hol-
ders and insert the rope directly.
The rope is automatically blocked.
Adjust the length of the rope accor-
ding to your individual requirements.
Note:
The ropes can only be moved while
holding down the tips of the rope
holders.
Press
Insert rope /
Pull down

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis