Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6.2.5 Terminal Assignment and Colour Coding
Input
Output
terminal
terminal
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
7

Commissioning

Before commissioning, carry out the following checks:
Check the enclosure and cable(s) for damage.
Check that mounting and installation have been performed correctly.
Ensure that seals and seal systems are clean and undamaged.
Remove any foreign objects.
If necessary, clean the connection chamber.
Ensure that the electrical lines have been laid correctly and connected securely.
Ensure that the stopping plug on the free cable gland between the connection chamber
and the Ex nR enclosure is attached (tightening torque 4 Nm).
Ensure that the seal for the Ex nR enclosure part is undamaged.
Ensure that the enclosure cover is correctly assembled and sealed with 4 screws in each
instance.
Seal unused cable entries on the Ex ec enclosure part with certified plugs (red).
Observe the operating instructions for the installed devices.
Check whether all the specified tightening torques have been observed.
284189 / 985160310020
2021-07-20·BA00·III·en·02
Function
Core pair
as per
TIA 568A
Tx+
3
Tx-
3
1
1
Rx+
2
Rx-
2
4
4
Core pair
Typical
as per
colour as per
TIA 568B
TIA 568A
2
White/green White/orange
2
Green/white
or green
1
Blue/white
or blue
1
White/blue
3
White/blue
3
Orange/white
or orange
4
White/brown White/brown
4
Brown/white
or brown
Ex nR Control Panel
Series 9851/5
Commissioning
DE
EN
Typical
FR
colour as per
TIA 568B
IT
ES
Orange/white
RU
or orange
NL
Blue/white
DK
or blue
White/blue
SE
White/blue
FI
Green/white
PT
or green
GR
PL
Brown/white
or brown
CZ
SK
HU
SL
RO
BG
LV
LT
EE
CH
KR
CN
17

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis