SAV 531.01
6 MAINTENANCE AND REPAIRS
Maintenance plan
In addition to the statutory requirements, we recommend observing the following maintenance schedule:
Measure
Examine the pole surfaces for
damage
Check the lifting eye for damage
and safety issues
Check the data tables
Acceptance test for safe working
load (SWL)
The annual acceptance test can be carried out here at SAV upon return of the device.
Version 1.0
Frequency
Daily
Weekly
■
■
[
]
51
Monthly
Annually
■
■
EN