Herunterladen Inhalt Inhalt Diese Seite drucken

Modster stream glider Betriebsanleitung Seite 4

Quelle: modster.at
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly of the main wings
1.
Take of the main wings & longer connecting rod and EDF power system from the package.
Connect the right and left wing by inserting the longer connecting rod. Then please install the
EDF power system to the fuselage and lock it by the 2pcs 4*25mm screws (the fan is facing
the head of the plane). Please make sure, that there is no gap or backlash.
Assembly of the horizontal wings
2.
Take of the horizontal wings and the shorter connection rod from the package. Insert the
connecting rod to the corresponding groove at the tail of the fuselage. Then install the horizontal
wings to the fuselage and lock them by screws under the horizon wing. Please note, that the
center of assembled horizontal wing should match the bulge mark at the vertical wing.
2

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis