Herunterladen Inhalt Inhalt Diese Seite drucken

Swan Cleaning Module-II Installationsanleitung Seite 16

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 22
Cleaning Module-II
Tubing
Operation with
If only one cleaning solution is used, channel 11 (canister and sole-
noid valve on the right side) is pumped.
one cleaning
solution
Make the following modifications to the tube connections:
1 Remove all tubes (pump tube, reagent tubes) belonging to
2 Disconnect the tube leading to the monitor from the distribution
16
channel 12.
block outlet [C] and connect it directly to the remaining pump
tube [B].
A
B
C
12
11
D
A
Peristaltic pump
B
Pump tube
C
Distribution block
D
Solenoid valve 11
(active channel)
E
Tube 14 or 15 leading
to the instrument
F
Pump tube of channel
12
F
E
A-96.250.599 / 020620

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Swan Cleaning Module-II

Inhaltsverzeichnis