Herunterladen Inhalt Inhalt Diese Seite drucken

Frontpanel; Rearpanel; Installation; Danger To Life - EuroLite SBM-16 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für SBM-16:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.2 Frontpanel

(1) Volt meter
(2) Ampere meter
(3) 16 A three-phase-current input plug

4.3 Rearpanel

4
5
(4) 16 A three-phase-current output socket
(5) Earthing screw
(6) Phase 3 power outlet
(7) Phase 2 power outlet
(8) Phase 1 power outlet

5. INSTALLATION

Please consider the DIN 15560 and the respective national norms during the
installation! The installation must only be carried out by an authorized dealer!
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
L3
6

DANGER TO LIFE!

12/14
L2
7
00043364.DOC, Version 2.0
L1
8

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

30248390

Inhaltsverzeichnis