Herunterladen Diese Seite drucken

FUTABA T18SZ Einbauanleitung Seite 7

Vorschau ausblenden Andere Handbücher für T18SZ:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Stick switch with 3-pos. (or 2-pos.) switch (and pushbutton)
For installation in Futaba T14SG/T18MZ/T18SZ
Tools required:
 wrench for M3 nut
 fine metal file
 small side cutter
 small needle-nose pliers
 tweezers
 small soldering iron with a fine tip
Needed:
 1 x nut M3
 4 x M5 nut
 1 x 4mm diameter washer
 shrink several sizes
Time required: 3 hours
Caution:
Remove when converting the transmitter battery before opening the case. Make sure
that no parts can fall (especially metal parts) to the open system, where they produce
short circuits. Shake the open system thoroughly to remove burrs.
Pay attention to ESD! Electrostatic discharge can damage your transmitter.
Do not touch the printed circuit boards in the open housing.
The installation is done at your own risk and may void the warranty of your radio
system.
The installation guide is a proposal and makes no claim to completeness or
accuracy.
The installation and use of stick switches and stick button in remote control systems
is the responsibility of the buyer. All liability and claims for damages resulting from
the use of this is explicitly excluded.
The installation instructions are to be used exclusively for private use and may not be
reproduced without consent, published or distributed to third parties.
info@rctechnik.de
Einbauanleitung/Manual
Rev. 3
Seite 7

Werbung

loading

Diese Anleitung auch für:

T18mzT14sg