1. Select the position of the barrier in relation to the gate, using parameter
from the inspection hatch side).
If the installation position is changed from the right to the left, the position of the spring(s) must
also be changed.
For the correct installation, refer to the barrier installation manual.
IMPORTANT! Lubricate the pivot points with lithium based grease (EP LITIO)
2. Check that the "operator present" function is not enabled (
3. Check the spring balance setting and the mechanical stop settings.
For further information, refer to the installation manual of the barrier.
IMPORTANT! Lubricate the pivot points with lithium based grease (EP LITIO)
4.
5. If the ACS/BA/60 detachable boom coupling system is not installed, the parameter
6. Move the barrier boom into the completely CLOSED position.
7. Press TEST (see TEST mode in paragraph 10.3) and check the command signal and safety device states. If the
safety devices are not installed, jumper the contact or disable safety device function from the relative parameter
(
,
and
).
) and the boom opening/closure gate on the left (seen
IMPOSTAZIONE DI FABBRICA
FACTORY SETTING
>45°
45°
. The factory setting of the
).
OPEN
CLOSE
<45°
must be set to
.
71