Contact  Maxeon  Solar  Technologies  if  there  are  any  unanswered  questions 
concerning the operating environment.    
 
5.2 Mounting Configurations 
Modules  may  be  mounted  at,  appropriate  orientation  to  maximize  sunlight 
exposure. 
 
In order to prevent water from entering the junction box (which could present a 
safety hazard), modules should be oriented such that the junction box is in the 
uppermost position and should not be mounted such that the top surface faces 
downward.  We also want to remind that the watertightness is not ensured by 
the  modules  but  by  the  mounting  system  and  that  drainage  should  be  well 
designed for AC modules. 
Clearance  between  the  module  frames  and  structure  or  ground  is  required  to 
prevent  wiring  damage  and  allows  air  to  circulate  behind  the  module.  The 
recommended  assembling  clearance  between  each  module  installed  on  any 
mounting system is a minimum of 5 mm distance.  
 
 
Clearance  between  the  module  frame  and  roof  surface  is  required  to  prevent 
wiring  damage  and  to  enable  air  to  circulate  behind  the  module.  Therefore  a 
minimum of 50mm is required between the module frame and the roof surface. 
 
When installed on a roof, the module shall be mounted according to the local and 
regional building and fire safety regulations. In case the module is installed in a 
roof integrated PV‐System (BIPV), it shall be mounted over a watertight and fire‐
resistant underlayment rated for such application  
Modules mounting systems should only be installed on building that have been 
formally  considered  for  structural  integrity  and  confirmed  to  be  capable  of 
handling the additional weighted load of the Modules and mounting systems, by 
a certified building specialist or engineer. 
 
Maxeon Solar AC modules are only certified for use when their factory frames 
are fully intact. Do not remove or alter any module frame. Creating additional 
mounting holes may damage the module and reduce the strength of the frame.  
 
Modules may be mounted using the following methods only: 
1)
Pressure  Clamps  or  Clips: 
Mount  the  module  with 
the  clips  attached  to  the 
longer sides of the module. 
Refer  to  the  allowable 
ranges in Section 5.0 (Table 
1  and  Table  2).  Installers 
must  ensure  the  clamps 
are of sufficient strength to 
allow  for  the  maximum 
design  pressure  of  the  module.  Clips  and  clamps  are  not  provided  by 
Maxeon  Solar  Technologies.  Clamps  that  secure  to  the  top  of  the  frame 
must not deform the top flange. Clamps must apply force collinear with the 
'wall' of the module frame and not only to the top flange. Clamps shall not 
apply excessive force to the frame, warp the top flange, or contact the glass 
‐  these  practices  void  the  module  warranty  and  risk  frame  and  glass 
breakage. Figure 1a illustrates locations for top frame clamp force. Avoid 
clamping within 50mm of  module  corners to  reduce  risk of frame  corner 
deflection and glass breakage. When clamping to the module frame, torque 
shall  never  exceed  15  N.m  to  reduce  chances  of  frame  deformation.  A 
calibrated  torque  wrench  must  be  used.  Mounting  systems  should  be 
evaluated  for  compatibility  before  installing  specially  when  the  system  is 
not using Clamps or clips. Please contact Maxeon Solar Technologies for the 
approval of the use of non‐standard pressure clamps or clips where torque 
values are higher than otherwise stated. 
2)
End  Mount:  End  mounting  is  clipping/clamping  of  solar  modules  at  the 
corner of short side to the supporting rail. The end‐mounting rail and clips 
or clamps must be of sufficient strength to allow for the maximum design 
pressure of the module. Verify this capacity for both 1) clamps or clips and 
2) end mounting system vendor before installation. 
 
 
                                  ©2021  Maxeon Solar Technologies, Ltd. All rights reserved. Specifications included in this document are subject to change without notice.     
Force must not deform
top frame flange or
glass may break
Force has
to be
applied in
line with
frame
wall
Figure 1a: Clamp Force Locations
5.3 Handling of Modules during Installation 
 
Never  lift  or  move  the  modules  using  cables  or  the  junction  box  under  any 
circumstances. Do not place modules face forward in direct contact with abrasive 
surfaces such as roofs, driveways, wooden pallets, railings, or walls etc. The front 
surface of a module is sensitive to oils and abrasive surfaces, which may lead to 
scratches and irregular soiling.  
 
AC Modules are featured with antireflective coated glass and they are prone to 
visible  finger  print  marks  if  touched  on  the  front  glass  surface.  Maxeon  Solar 
Technologies recommends handing AC Modules with gloves (no leather gloves) 
or limiting touching of the front surface.  Any finger print marks resulting from 
installation will naturally disappear over time or can be reduced by following the 
washing guidelines in Section 6.0 below. Any module coverage (colored plastic 
tarps  or  similar)  during  installation  can  lead  to  permanent  front  glass 
discoloration and is not recommended. The use of vacuum lifting pads can cause 
permanent marks on the front glass.  
Shading incidence need to be avoided during PV system operation. The system is 
not supposed to be energized until the mounting scaffolding or railing have been 
removed from the roof. 
 
Systems should be disconnected in any cases of maintenance which can cause 
shading  (e.g.  chimney  sweeping,  any  roof  maintenance,  antenna/dish 
installations, etc.). 
 
6.0 Maintenance   
Maxeon Solar Technologies recommends visual inspection on a regular basis of 
AC  modules  for  safe  electrical  connections,  sound  mechanical  connection,  and 
freedom from corrosion. This visual inspection should be performed by trained 
personnel.  The  standard  frequency  is  once  a  year  according  to  environmental 
conditions.  
  
Periodic cleaning of AC Modules is recommended, but is not required. Periodic 
cleaning has resulted in improved module performance, especially in regions with 
low  levels  of  annual  precipitation  (less  than  46,3cm  (18,25  inches)).  Consult 
installer supplier about recommended cleaning schedules for your area. Do not 
clean or spray modules with water during normal operation (module glass surface 
is hot).  To clean a module, spray it with potable, non‐heated water. Normal water 
pressure  is  more  than  adequate,  but  pressurized  water  100  bar  (min  50  cm 
distance) may be used. Fingerprints, stains, or accumulations of dirt on the front 
surface  of  the  module  may  be  removed  as  follows:  rinse  the  area  and  wait  5 
minutes. Re‐wet the area and then use a soft sponge or seamless cloth to wipe 
the glass surface in a circular motion. Fingerprints typically can be removed with 
a  soft  cloth  or  sponge  and  water  after  wetting.  NEVER  use  harsh  cleaning 
materials such as scouring powder, steel wool, scrapers, blades, or other sharp 
 
instruments to
clean module glass. Use of such materials on the modules will void 
the product warranty.  
 
Shipping Position: 
 
Install Position: 
 
 
MAXEON SOLAR TECHNOLOGIES, LTD. 
537620 Rev.B 
 
 
   6

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis