Herunterladen Inhalt Inhalt Diese Seite drucken

HomeMatic IP HmIP-BROLL Installations- Und Bedienungsanleitung Seite 47

Rollladenaktor für markenschalter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Switch off the fuse of the power circuit
(see "6.1 Installation instructions" on page
44).
If necessary, pull the rocker off the frame
of the relevant switch. Then pull the
frame off the switch together with the
clamping/retaining piece. The clamping/
retaining piece can be transparent, grey
or black depending on the manufacturer,
and holds the frame onto the switch.
To make removal easier, a flat, pointed
object such as a slotted screwdriver can
be used.
Release the wiring and remove the exist-
ing switch if necessary.
Connect the switched phase conductors
for connecting terminals 1 and 2 to the
motor as follows (see fig. 2):
Connecting terminal 1 (C) : "Down"
Connecting terminal 2 (D) : "Up"
Connect the phase conductor to
connecting terminal L (B) .
Connect the neutral conductor to
connecting terminal N (E) .
Start-up
47

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis