Herunterladen Inhalt Inhalt Diese Seite drucken

Attaching The Cable-Management Arm Ramp Assembly - Dell HT118 Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 54
6 Close the cable basket.
7 Slide the system in and out of the rack to verify that the cables are routed
correctly and do not bind, stretch, or interfere with the movement of the
cable-management arm. Adjust the cable positioning inside the cable-
management arm as needed.
8 When you are satisfied that the cables are routed correctly, push the
system fully into the rack.
Attaching the Cable-Management Arm Ramp
Assembly
The cable-management arm ramp assembly guides the cable-management
arm into a stable, level position. To attach the cable-management arm ramp
assembly:
1 Select only one ramp assembly, depending on the orientation of the cable-
management arm.
a
b
CAUTION:
to prevent long-term sagging of the cable-management arm.
22
Downloaded from
www.Manualslib.com
NOTE:
If you pull the system out to its furthest extension, the slide assemblies
will lock in the extended position. To release the lock, press the slide release
latch on the side of each slide and then slide the system into the rack.
If the cable-management arm is attached on the right side of the rack
(as shown in Figure 1-11), attach the left cable-management arm
ramp assembly to the rack (see Figure 1-10).
If the cable-management arm is attached on the left side of the rack,
attach the right cable-management arm ramp assembly to the rack
(see Figure 1-10).
The cable-management arm ramp assembly must be installed
NOTE:
Ensure that you use the cable-management arm ramp assembly
with the metal ramp facing toward the center of the rack (see Figure 1-10).
NOTE:
The orientation shown in Figure 1-10 presumes you are facing the back
of the system.
Rack Installation Guide
manuals search engine

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis