Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting Points - LD Systems LDSATG2 Bedienungsanleitung

Passive installation speaker
Vorschau ausblenden Andere Handbücher für LDSATG2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 10

MOUNTING POINTS

1
Four M8 flight points per speaker.
2
One M10 thread is located on the top and on the bottom of the speaker. The M10 thread on the top can be used for mounting the
optional traverse clamp LDEBG3SCP (picture A), while the two M10 threads (top and bottom) can be used for mounting a pivoting wall holder
(picture B, optional).
3
Four M6 threads for mounting the tilting and pivoting wall holder GSPWMBS20 (picture C, optional).
4
Two M6 threads for mounting the tilting and pivoting wall holder GSPWMBS20 (picture D, optional, remove mounting plate from wall holder).
NOTE: Overhead installation may only be carried out by qualified personnel. The speaker must be fitted so as to ensure it does not fall down.
6
1
1
2
1
3
1
LDSAT102G2 und LDSAT122G2
A
1
1
2
1
4
1
LDSAT262G2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis