Herunterladen Inhalt Inhalt Diese Seite drucken

Installation In Overflow Pools; Installation In Above-Ground Pools - JETStream TREVI Montage- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
2
(230 V)
rubber buffer
55
min. 20
4.3 Installation in Overflow Pools (please unfold the last page, Fig. 2)
With overflow troughs, uwe recommends mounting a brass intermediate frame (9). If the height of the front tuck
stone allows, this can be made from channel sections. Fasten this intermediate frame to the edge of the pool
using submergible screws.
Due to the many possible trough shapes and sizes, please make the intermediate frame on-
site.
The unit is installed in the same way as described for in-ground pools. However, do not fasten the unit to the edge
of the pool, instead drill an M 8 thread in the intermediate frame and screw the unit to the frame.
4.4 Installation in Above-Ground Pools (please unfold the last page, Fig 3)
Screw the support (10) (accessory, not included in the delivery) to the underside of the base plate with the 4 plastic
hexagon screws provided. Loosen the retention pins (1) by turning anticlockwise and push the pins apart.
Position the unit as required on the edge of the pool.
The unit must be in a horizontal position.
Positioning the Nozzle
Adjust the nozzle (2) to the water level. To do this, unscrew the hexagon nuts (3) and move the nozzle either up
or down to the correct height.
The nozzle must be 20 cm below the surface of the water. The distance from the edge of the
pool down to the water level must not exceed 27 cm
Further Installation
Secure the unit together with the rubber buffer (4) to the pool wall.
The gap between the pool wall and the back of the housing submerged in the water must be at
least 20 mm.
Unscrew the retention screw (11) for the support (10) and slide the support out until it stands on the floor when the
unit is in a horizontal position.
Secure the support to the ground. If the ground under the support is loose, lay a flag stone underneath the support
(small concrete foundation).
Fit the retention pin (1) on the edge of the pool and tighten.
Unscrew the screw plug (8). Slowly fill the pump with water.
Measurements in mm
16
2
(400 V)
min. 20
Measurements in mm

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Trevi lux

Inhaltsverzeichnis