Herunterladen Diese Seite drucken

Building In - Pelgrim GKB410 Anleitung

Vorschau ausblenden Andere Handbücher für GKB410:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

installation instructions
56

building in

1. Make the cut-out in the work surface. Ensure that there is sufficient space
allowed at the sides and at the back.
589
560
min. 50
600
GKB410/415/416/417
720
560
min. 50
600
GKB475/477/478
Please note:
The distance between the hob and the rear wall must be at least 50 mm.
2. Make a hole in the side of the kitchen cabinet to enable the gas pipe to be
passed through.
3. Place the appliance in the cut-out.
510
720
47
490
490
560
min. 50
600
GKB470W/472W
510
720
510
47
490
490
560
min. 50
600
GKB475W/477W/478W
installation instructions
57
510
47
47
4. Secure the appliance in
position.
5. Make the gas connection. Check the gas connections with a soap/water
mixture (see "Gas Connection").
6. Put the plug in the socket (see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with a built-in oven is described in
the installation guide for the oven.
Attention:
The underside of this built-in hob becomes hot. Take care that you do not
place any flammable or plastic objects in any drawer under the appliance.

Werbung

loading