Herunterladen Inhalt Inhalt Diese Seite drucken

Ups Setup; Tools Required; Checking The Battery Recharge Date - Powerware 5125 Installationsanleitung

Ibm-anwendungen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 35
Table 5. UPS Model Specifications
IBM Model Number
Output Receptacles
Input Connection
Power Rating
Voltage
Frequency
NOTE
For more information refer to "Specifications" in the Powerware 5125 User's Guide .

UPS Setup

Powerware
®
5125 Installation Guide for IBM Applications
Downloaded from
www.Manualslib.com
16A, IEC 320-C20 input connector
NOTE If your UPS is already installed in an IBM pSeries (RS/6000) system, then skip
to "Installing Optional Equipment" on page 5.

Tools Required

To assemble the components, the following tools may be needed:
: Medium flat-bladed screwdriver
: #2 Phillips screwdriver

Checking the Battery Recharge Date

Check the battery recharge date label located on the UPS carton.
NOTE If the battery recharge date has expired and the batteries have never been
recharged, contact your service representative (see "Service and Support" on page 13).
:
164201356 B Uncontrolled Copy
manuals search engine
P33
(9) IEC 320-C13, (1) IEC 320-C19
3.0 kVA/2.7kW
200–240V single-phase
50/60 Hz, auto-sensing
Installation
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis