Acoustic power level (acc. EN 3746):
Idling
Operating
Acoustic pressure level (EN 11202):
Operating position 1:
Idling
Operating
Operating position 2:
Idling
Operating
The specified values are emission
levels and are not necessarily to be
seen as safe operating levels.
Although there is a correlation
between emission and immission
levels, these do not constitute a basis
for determining the necessity of
additional safety measures.
Workplace conditions which could
influence the noise immission level
include the duration of resonance,
spatial particulars, other noise
sources etc. For example, the number
of machines and other work being
performed. The permissible workplace
levels can vary from country to
country.
This information is intended to allow
the user to make a better estimation
of the hazards and risks involved.

4.3 Dust emission

The planer JWP-2510 has been dust
emission inspected.
At an air velocity of 20 m/s on the dust
port dia 150mm:
Vacuum pressure
Volume flow
The machine meets a workplace dust
emission limit of 2 mg/m³.

4.4 Content of delivery

4 Leveling feet
4 Lifting hooks (installed)
Dust chute Dia 125mm
Dust chute adapter Dia 125/150mm
10 spare carbide inserts
10 spare Torx-screws
2 Torx screw drivers
Assembly kit
Operating manual
Spare parts list
5. Transport and start up

5.1 Transport and installation

For transport use a forklift or hand
92,6 dB (A)
trolley. Make sure the machine does
100,5 dB (A)
not tip or fall off during transport.
Lifting:
Use the installed lifting hooks ( Fig 1)
74,4 dB (A)
to lift the machine.
85,8 dB (A)
84,4 dB (A)
85,7 dB (A)
Warning:
The machine net weight is 725kg
Assure the sufficient load capacity
and proper condition of your lifting
devices.
Never step underneath suspended
loads.
After installation, the lifting hooks can
be removed.
Installation:
The machine is designed to operate in
closed rooms and must be placed
stable on firm ground (preferably
concrete floof).
Use the supplied leveling feet, screws
1350 Pa
and nuts for leveling adjustments (Fig
1200 m³/h
2).
The machine can be bolted down if
required.
For packing reasons the machine is
not completely assembled.
5.2 Assembly
Fig 1
Fig 2
5
If you notice any transport damage
while unpacking, notify your supplier
immediately. Do not operate the
machine!
Dispose of the packing in an
environmentally friendly manner.
Clean all rust protected surfaces with
a mild solvent.
Installing Dust Hood
Mount the dust hood with 8 screws,
spring washers and flat washers (Fig
3).
Fig 3

5.3 Mains connection

Electricals should be installed so that
they are protected from damage and
exposure.
Mains connection and any extension
cords used must comply with
applicable regulations.
The mains voltage must comply with
the information on the machine
licence plate.
The mains connection must have a
32A surge-proof fuse.
Only use connection cables marked
H07RN-F
Connections and repairs to the
electrical equipment may only be
carried out by qualified electricians.

5.4 Dust connection

Before initial operation, the machine
must be connected to a dust extractor.
The suction should switch on
automatically when the planer is
switched on.
The flow rate on the suction port must
be 20m/sec.
Flexible hoses must be of non-
flammable quality, and must be
connected to the machine ground
system.