1. Safety and EMC instructions

Please read carefully the following user manual and the safety instructions before installing the unit or using
the unit!

1-1. Transportation and Storage

impact.

1-2. Preparation

The UPS system must be absolutely dry before being installed. Please allow at least two hours for the
UPS system to acclimate the environment.
1-3. I nstallation
equipment)) to the UPS output sockets or terminal.
ventilation. Ensure enough space on each side for ventilation.
earth bonding to the external UPS battery cabinets.
building wiring installation.
UPS in any mode of operation should be provided in the building wiring installation.
regulations.
Downloaded from
www.Manualslib.com
Please transport the UPS system only in the original package to protect against shock and
The UPS must be stored in the room where it is ventilated and dry.
Condensation may occur if the UPS system is moved directly from cold to warm environment.
Do not install the UPS system near water or in moist environments.
Do not install the UPS system where it would be exposed to direct sunlight or nearby heater.
Do not block ventilation holes in the UPS housing.
Do not connect appliances or devices which would overload the UPS (e.g. big motor-type
Place cables in such a way that no one can step on or trip over them.
Do not block air vents in the housing of UPS. The UPS must be installed in a location with good
UPS has provided earthed terminal, in the f inal installed system conf iguration, equipotential
The UPS can be installed only by qualif ied maintenance personnel.
An appropriate disconnect device as short-circuit backup protection should be provided in the
An integral single emergency switching device which prevents further supply to the load by the
Connect the earth before connecting to the building wiring terminal.
I nstallation and Wiring must be performed in accordance with the local electrical laws and