Herunterladen Inhalt Inhalt Diese Seite drucken

DHC BT1000 HD Bedienungsanleitung Seite 11

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
24V Battery Pack Test:
1.
Clamp 24V battery pack to get 24V pack
voltage.
(Using red clamp to connect positive
terminal of battery 1, black clamp to
connect negative terminal of battery 2)
2.
Clamp Battery 1 to start battery 1 test within
15 secs.
(Using red clamp to connect positive
terminal, black clamp to connect negative
terminal of battery 1)
3.
Please refer to 12V battery test procedures to finish battery 1 test.
4.
Once battery 1 test is completed, please
connect battery 2. Within 15 secs.
(Using red clamp to connect positive
terminal, black clamp to connect negative
terminal of battery 2)
5.
Please refer to 12V battery test procedures to finish battery 2 test.
6.
Once battery 1 & 2 tests are completed, press enter to see battery 1 & 2
results.
7.
Press the ◄ ► key to select result printing:
YES or NO. Press «ENTER» to confirm
your choice.
SYSTEM TEST:
1. Select "SYSTEM TEST" from the main menu.
2. Turn off all vehicle accessory loads such as light,
air conditioning, radio, etc. Before starting the
engine.
BATT. 1 RESULT
PRESS ENTER
11
11
24V BATT. PACK
TEST
CLAMP BATT. 1
CLAMP BATT. 2
BATT. 2 RESULT
PRESS ENTER
PRINT RESULT?
YES/NO
SYSTEM TEST
xx.xx V
TURN OFF LOADS
START ENGINE

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bt1000

Inhaltsverzeichnis