Herunterladen Inhalt Inhalt Diese Seite drucken

Setting Up / Commissioning - IDEAL AP35 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Setting Up / Commissioning

CAUTION!
Unplug the mains plug from the socket.
1. Open the filter cover.
To open the filter cover, get hold of it at the top
on the right and left-hand sides.
2. Take out the fi lters.
Remove the plastic sheet packing from all
fi lters and then follow the fi lter installation
instructions. Filter fi tting order:
Ultra PM 2.5 fi lter >
Deodorization fi lter > Pre-fi lter
(see Filter functions on Page 27)
3. Re-attach the filter cover on the device.
28

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis