Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 229

BOTTLE FILLING

This operation must be performed whenever the available refrigerant fluid in the bottle is less
than 3 kg and must in any case be performed when the "empty bottle" alarm is displayed.
From MAINTENANCE, select BOTTLE FILLING, the following screen will be displayed:
Procure a bottle of appropriate refrigerant (R134a or R1234yf depending on machine model),
connect and open LP coupler to the liquid side of the external bottle and open the liquid valve,
then press OK.
The following screen will be displayed:
Use the keypad to insert the amount of refrigerant, then press OK to continue.
The BOTTLE FILLING will start
the machine will now fill the machine bottle with the preset quantity ~ 500g. When the quantity
minus 500 grams is reached, the machine will stop and display:
INSTRUCTIONS MANUAL
R134a
BOTTLE FILLING
2 valve bottle
R134a
Set amount:
Min
MAX
BOTTLE FILLING
R134a
Bottle Pressure
Ext. Bottle Pressure
BOTTLE FILLING
R134a
Close liquid valve of the external bottle
Press OK to continue
2 valve bottle
BOTTLE FILLING
-90-
MAINTENANCE
1 valve bottle
MAINTENANCE
MAINTENANCE
MAINTENANCE
1 valve bottle

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Sun BLIZZARD QTECH III

Inhaltsverzeichnis