Herunterladen Inhalt Inhalt Diese Seite drucken

Helios EVS Montage- Und Betriebsvorschrift Seite 54

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Operating Instructions
EN
EVS-FUEC
Wiring diagram - FUEC 001
Note: Valid for the connection of smoke extraction fans with frequency inverter control system
Feed-in
FU / EC
On-site
+24VDC
24
Lamp test
ye
DL plug
14 pol.
EVS-ST3.2
Fireman's switch
-
1
2
3
4
10kW
1
1
2
3
6 7
ye gn rd
1
2
3
6
2
10kW
1
2
3
6 7
ye gn rd
max. no.: 6
Ref.no.: 08255-004
Fireman's switch
FWS2
4x2x0,8mm
(shielded)
-W4
Smoke exhaust fan control system – EVS
Fan control via FU
The fan motor is NOT protected against
overcurrent in smoke extraction mode!
Repeated activation in the short term can
lead to the destruction of the motor!
-X5 1
2
4
6
1
3
5
25 26
Y
br
Stage 1:
U = 0-5V
Stage 2:
U = 5-10V
Smk extr.:
U = Stage 2 / 10V
OnBoard diagnosis
I
max. 10mA
Y
Stage 1
Stage 2
BMZ autoRST
ON
BMZ
Ventilation funct.
24VDC
+ -
Signals
-
10 11
12 13
17 18
5
6
7
8 9
1
2,7kW
8 9
BMZ
rd
7
8 9
3
2,7kW
8 9
4
BMZ
2
1
3
rd
BMZ
WSUP
-
-
2x2x0,8mm
2x2x0,8mm
(shielded)
(shielded)
-W5
-W6
ATTENTION
Rep. switch
Ready signal
2
3
-K1
60 61
50 51 52
53 54 55
+
System
reset
Smoke extr.
Fault
Signal
Signal
Press button:
pot.-free
pot.-free
10V
direct : DKM, BMZ
max. contact load
> 1sec: RMR
230V AC / 2A
Stage 2
> 3sec: FWS
Button
Switch
Smoke detector
Pushbutton alarm
-
-
22
23
19
20
15
16
21
1
10kW
10kW
1
-
+
-
1
2
3 4 5
6
7
gn
rd
Ein
Prev. detector
Previous detector
-
+
-
1
3 4 5
6
2
10kW
10kW
2
-
+
-
1
2
3 4 5
6
7
rd
gn
max. no.: 60
max. no.: 20
Ref.no.: 04984-005
Ref.no.: 04985-003
Smoke detector
Pushbutton alarm (button)
RMR
DKM
2x2x0,8mm
4x2x0,8mm
(shielded)
(shielded)
-W8
-W7
22
Fan control with EC motor
The specific nominal data and
terminal allocation can be found in
the FU/EC motor data sheet!
Control line to EVS
2
4
6
1
3
5
On-site 10A
31 32
27 28
Motor prot.
Control system
230VAC
F1
Reset
MT 2A
24V/15VA
F2
-
N
MT 0,4A
Return signal
L
isolator switch
40 41 42 N
14
29
30
1
PE
8
ye
8
Remove resistor or jumper if unit or detector
1
connected.
Insert resistor 10kW at last or only detector in
2
circuit.
8
Insert resistor 2,7kW at last or only detector in
3
circuit.
Ventilation only through smoke extraction fans with
ye
4
ventilation function
Rep.
Cable function-maintaining
The specified cable types and dimensions are
minimum requirements without taking installation
Isol. switch
type, cable length, network type and necessary
RS 3+1...
function maintenance into account. The decisions
regarding the building must be made independently
2x2x0,8mm
(shielded)
by the executing installer.
-W9
Vers: 03.04.2019
Issue: 001
Supply line
-X1 L1 N PE
-K1
N
45
46
L
L
N
St.1
St.2
Rel.
ventil.
Smoke extr.
Rel.
ventil.
N
43 44
PE
PE
Z A N
PE
M
1~
Smoke exhaust
Return signal
damper
damper "open"
5x1,5mm²
3x1,5mm²
-W10
-W11

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis