Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning - Speck Zismatic 40/10 WE Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5

Commissioning

Before commissioning, check that the power network's
voltage and frequency values correspond to those indicated
on the pump's name plate.
Ensure that the pump is completely submerged.
1.
Open the taps completely.
2.
Establish power supply.
 It can take a short time for the water to reach the end of
the piping!
If the integrated sensor detects an absence of water, the
pump stops running. The sensor will make 4 attempts to start
the pump. If the pressure cannot be reset due to a lack of
water, the pump will keep the error message until the pump
is manually reactivated (by turning the power supply off and
on again).
On
Off
WG64.010.001-2-P
Fig. .
The pump is equipped with an anti-blocking system.
Following 100 seconds of inactivity the pump will
automatically be turned on for 2 seconds. This prevents the
hydraulic parts from becoming blocked.
06|2019
1'
5'
Attempt 1
Attempt 2
Commissioning
15'
60'
Attempt 3
Attempt 4
EN 17

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis