Herunterladen Inhalt Inhalt Diese Seite drucken

EFA Z 078 E Betriebsanleitung Seite 12

Inhaltsverzeichnis

Werbung

Factory connection
Terminal box on the pump case
Figure 4: Factory electrical connection, terminal box on the pump case
Customer circuit
For instructions on the rotational direction prior to commissioning, see Chapter 3.1 "Commissioning" (P. 9)
Fan engine
Operating voltage
Current
Speed
Power Output
Protection class
Factory connection
Schmid & Wezel
D 75433 Maulbronn
Figure 5: Customer electrical connection
Table 2: Version with third-party fan
Axial fan AD 213-AB02-02 Fa. EBM
400/230 Y' 50 Hz; 460/265 Y' 60 Hz (other
voltages available on request)
0.22/0.38 A 50 Hz; 0.26/0.45 A 60 Hz
2,650 min
110 W 50 Hz; 160 W 60 Hz
IP 44, humidity protection
same clamp assignment as engine (see Fig.
4 „Terminal Box on Pump Case")
Page
11/ 17
12/32
-1
-1
50 Hz; 2,950 min
60 Hz
Version
09/14
03.2005
10.2013

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Z 090 e

Inhaltsverzeichnis