Herunterladen Diese Seite drucken

Installation Check-Up - LaCimbali M39 Dosatron TE Gebrauch Und Installation

Vorschau ausblenden Andere Handbücher für M39 Dosatron TE:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 100
These chapters in the manual are to be used by qualified, authorized technical staff.
WaRnInG:
AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WaRnInG: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
GRoUpS
Hook up the filter holders to the groups (without coffee).
Let each group dispense water for about a minute.
HoT WaTER
Continuously dispense hot water (pressing the appropriate button) until at least 5 liters of water have been used for a ma-
chine with 2 groups, 8 liters for a machine with 3 groups and 10 liters for a machine with 4 groups (see the "Cleaning and
Maintenance" Chapter in the User's Manual).
STEam (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.

6. Installation Check-up

44

Quicklinks ausblenden:

Werbung

loading