Herunterladen Diese Seite drucken

Juliana Senior Montageanleitung Seite 4

Vorschau ausblenden Andere Handbücher für Senior:

Werbung

May we congratulate you on your new Greenhouse
GB
Dear Customer!
The assembly of your new greenhouse requires no
technical knowledge. However, it is important that
the assembly instructions are followed strict-ly. The
assembly instruction is a combination of text and
illustrations. The profiles are packed in separate
numbered packs corresponding to the order in the
assembly instruction. Erect one pack at a time. All
nuts and bolts and fittings are found in bag No. 0
(specified on page 12). Each pack is specified in
separate lists of components.
All detailed illustrations are marked with symbols:
seen from inside
seen from outside.
Precautions.
Assembly must only be carried out in dry and
calm weather.
Always use working gloves while glazing.
Greenhouse glass has sharp edges,
especially if the glass breaks.
Assistants and especially children must be
warned that broken glass is an element of
danger. Pick up broken glass at once and
remove it with care.
We recommend to use protective glasses
while fixing the spring wire clips.
Place the ladder on a level support.
It is essential to have an assistant.
References
The column marked
indicates the page(s)
on which the component is used.
Page 13:
Foundation
The base is not included in this delivery. However,
an original base can be bought separately. It
ensures you a stable and easy to build base.
If you make your own base the measurements
indicated must be external measurements.
If you buy an original base you furthermore need
about 75 litres of concrete and 6 plastic-/concrete
pipes of about 800 mm which are placed in a non-
freezing depth for the fastening of the corner and
middle anchors.
The base must be 100% level and square; the
latter is ensured by checking that the two diagonal
measurements are equal.
Tools
The mounting of the greenhouse requires the tools
shown on page 12.
Page 14-21:
Place the components as shown on the illustration
and assemble in the order shown in the pictures.
Do not tighten the nuts completely until the front
gable construction has been assembled.
Page 13:
(Fastening to the base).
When constructing your own base you have to drill
holes (7 mm) in the ground frame between all the
vertical frames, the greenhouse is then fastened to
the base with screws (A).
Using an original base the greenhouse is fastened
to each vertical bar as shown on drawing B.
Page 22-25:
For an easier assembly we recommend that you oil
the screws for the doors /windows.
Fitting of glass
Important before glazing!
Make sure that gables and sides are level and
square, and that door(s) and window(s) are
functioning perfectly.
Best order of assembly:
1) Windows – 2) Roof – 3) Doors – 4) Gables – 5)
Sides
Page 28-29:
Glazing (illustration 1 to 8)
Degrease the sheets and frames with acetone.
A-lists are mounted as shown on page 31. Put the
sheet into the bottom list, bend the sheet slightly
outwards and put it in the top list.
M-lists are mounted as shown on page 28. Place
the upper part of the list under the alu. profile in the
whole length of the glass and hereafter click on the
list from above.
Now your greenhouse is completely assembled.
However, please notice the following:
Maintenance
Grease doors (hinges and lock or doortrack).
Clean the gutter for leaves, etc.
Adjustment of windows.
Replacement of broken glass.
Clean the greenhouse with disinfectant before
and after the growing season.
Winter Protection
In areas with occurrence of snow we recommend
the following winter protection:
Support the roof ridge at the centre of the
greenhouse.
Remove greater snow loads from the roof.
Take precautions against snow falling down
from for instance a tree or a roof.
Dismount the cylinders for the automatic
window openers, if any (optional extras).
Secure door(s) and window(s) preventing wind
damage to the greenhouse.
Snow of a depth of 10 cm or more is
dangerous and must be removed.
Insurance
Please note that not all insurance companies
cover greenhouses automatically. Please contact
your insurance company to ensure an insurance
coverage.
B
Guarantee
Juliana grants a guarantee of 12 years which
covers replacement of faulty parts. The guarantee
does not cover glass, transport, assembly, freight
etc.
Juliana grants a guarantee of 2 years on painted
parts, if any. Note that marks in the painting may
occur due to suspension of the profiles.
The guarantee is invalid if the greenhouse is not
assembled according to these instructions.
Complaints
All our greenhouses are built to high standards of
quality. However, should a complaint occur please
contact your dealer at once. Remember to specify
the defect by indicating the greenhouse model and
number of the component and the quality control
number.
Accessories.
Your retailer has a wide range of accessories
to offer you, which both help to increase your
harvest and facilitate work in the greenhouse. The
greenhouse is approved for Juliana accessories
only, and other solutions must not be fitted to its
construction.
- Juliana plant rings/brackets: A maximum of 15 kg
may be hung on each plant ring/bracket and only
one plant ring/bracket per roof bar.
- Juliana shelves: Single shelves are designed to
carry max. 20 kg only, evenly distributed across the
shelf.
Product name: Senior
Manufacturer: Juliana A/S
USA

Werbung

loading

Verwandte Produkte für Juliana Senior