Herunterladen Inhalt Inhalt Diese Seite drucken

Connections; Connection Overview - LG D005KD1N111 Installationsanleitung

Vorschau ausblenden Andere Handbücher für D005KD1N111:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
22

Connections

Connection Overview

2
PV Array 1
WARNING
y Electrical shock hazard. Do not touch uninsulated wires when the PCS cover is removed.
y Before starting electrical cable connections or removing the cover, turn off the AC circuit
breaker, PV switch and DC circuit breaker of the battery. (In case of re-installation, turn them off
and wait at least 10-minute standby period of time for complete discharge within this product.)
y When the photovoltaic array is exposed to light, it supplies a DC voltage to the PCS.
Battery
PV Array 2
Grid
Energy meter
Internet

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis