Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance - Ranpak Geami WrapPak HV Betriebsanleitung

Schutzverpackungslösung
Vorschau ausblenden Andere Handbücher für Geami WrapPak HV:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 77
Geami WrapPak HV
3.8

Maintenance

EN
Before performing maintenance on the converter, the
electrical supply must be turned off by pulling the power plug
from the wall socket.
Pay attention to sharp edges and corners
of the converter due to the risk of cutting.
Warning!
Do not operate the converter when
the safety
removed.
Warning!
Cleaning of the converter should be performed at least once
a week:
Remove paper scraps.
Wipe with a dry, damp cloth to remove excess paper dust.
At least once a year the converter needs to be inspected by
a qualified person.
The following points need to be checked:
Various converter adjustments
Operation of the safety provisions
Legibility of the warning stickers
Wear and tear of parts
Clean cutting area
Quality of the Geami WrapPak end product.
3.8.1 Repair / Replacing Parts
Repairs can only be carried out by a qualified service
technician.
Only Ranpak supplied parts are permitted for use as
replacement parts.
Parts can be ordered by a Ranpak distributor.
Deviating from the instructions above can affect the
safety of the converter. The manufacturer cannot accept
liability for such deviations
5
®
devices
are switched off or
Geami WrapPak HV Operator Manual - EN

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis