Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation; Battery Installation - Omron M6 Comfort Bedienungsanleitung

Automatic blood pressure monitor
Vorschau ausblenden Andere Handbücher für M6 Comfort:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 68

2. Preparation

2.1 Battery Installation

1.
Remove the battery cover.
2.
Insert 4 "AA" batteries as
indicated in the battery
compartment.
3.
Replace the battery cover.
Notes:
• When the low battery symbol (
at the same time. Long life alkaline batteries are recommended.
• The measurement values continue to be stored in memory even after the batteries are replaced.
• The supplied batteries may have a shorter life.
Disposal of used batteries should be carried out in accordance with the national/local regulations for the
disposal of batteries.
) appears on the display, turn the monitor off, then replace all batteries
EN
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis