Herunterladen Inhalt Inhalt Diese Seite drucken

Function Keys; Getting Started; Power Supply; Preparation - Pce Instruments Pce-Ct 90 Bedienungsanleitung

Schichtdickenmessgerät
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

3.3

Function keys

Key
Description
On/Off
Unit
Zero-point calibration
4

Getting started

4.1

Power supply

For power supply, two AAA Alkaline batteries are required. Before replacing the batteries, turn off
the meter. The battery compartment is located at the rear side of the meter and fixed with two
screws. Loosen the screws and remove the cover. A black battery dummy is glued into the third
battery location. Do not try to remove the dummy. Insert the two batteries as marked and close the
battery compartment by tightening the screws.
4.2

Preparation

Connect the included probe or one of the optional probes to the probe socket of the meter.
Observe the correct position of the plug (red spot). To start the meter, press
shows the start screen. The meter will then be in measuring mode. To turn off the meter, press
and hold
.
4.3

Settings

4.3.1
How to select the unit
The unit can only be changed from µm to mm or vice versa when an Fe probe is connected. When
an M probe is connected, the only possible unit is mm. To change the unit, press the
The unit currently set is shown in the upper part of the display. It can be changed in measuring
mode and in mean value mode.
Functions
- On/off (2 s)
- Decrease value (Calibration)
- Unit selection (µm or mm)
- Change mode (measuring mode, mean value mode)
- Increase value (Calibration)
- Calibration of zero point
- Delete readings in mean value mode
© PCE Instruments
16
until the display
key once.
Inhaltsverzeichnis
loading

Inhaltsverzeichnis